Introduction
DCFootprint estimates the environmental impacts of the life cycle of the Datacenter, depending on its generic description (based on the input parameters), before computing the share of impact of each other Functional Unit.
This Functional Unit “1” is defined in the Ademe Cloud & Datacenter PCR, as “Provide hosting services for operation of the IT equipment”.
Version 1 - early stage version
This is the very first version of the methodology. It will evolve in the future, in order to be able to compare results between each model version. Please see the roadmap page.
To discuss about this methodology and how it should evolve, please look for an existing thread or open a new one, on community.dcfootprint.org.
Life Cycle coverage and respect of norms
| Environmental display - Life Cycle stage | ITU L.1410 - Life Cycle stage | Coverage in Ademe Cloud & DC PCR | Coverage in DCFootprint’s Functional Unit |
|---|---|---|---|
| 🏗️ Manufacturing | Raw materials extraction | Mandatory | ✅ see the methodology section for details |
| 🏗️ Manufacturing | Raw materials processing | Mandatory | ✅ see the methodology section for details |
| 🏗️ Manufacturing | IT equipment production - Component production | Excluded from this functional unit (see FU2, FU3 and FU4) | ⚠️ Included as a share of the global IT impacts estimated for the Datacenter |
| 🏗️ Manufacturing | IT equipment production - Assembly | ⚠️ Included as a share of the global IT impacts estimated for the Datacenter from this functional unit (see FU2, FU3 and FU4) | Excluded |
| 🏗️ Manufacturing | IT equipment production - Support activities of IT equipment manufacturers | Excluded from this functional unit (see FU2, FU3 and FU4) | Excluded |
| 🏗️ Manufacturing | Support goods manufacturing | Mandatory | ✅ see the methodology section for details |
| 🏗️ Manufacturing | Construction of ICT specific site | Mandatory | ✅ see the methodology section for details |
| 🚚 Distribution | Mandatory | Partially included | |
| 🔧 Installation | Optional | Partially included | |
| ⚡ Use | IT equipment use | Excluded from this functional unit (see FU2, FU3 and FU4) | ⚠️ Included as a share of the global IT impacts estimated for the Datacenter |
| ⚡ Use | Support goods use | Mandatory | ✅ see the methodology section for details |
| ⚡ Use | Operator support activities | Mandatory | ✅ see the methodology section for details |
| ⚡ Use | Service provider support activites | Excluded | Excluded |
| 🗑️ End of life | Preparation of ICT equipment for reuse | Mandatory | Partially included |
| 🗑️ End of life | Storage / Disassembly / Dismantling / Shreding | Mandatory | Partially included |
Methodology
FU1Impacts(1 kW, 1 Year) = DatacenterImpacts / CommercializedPower / DatacenterLifetime
With:
DatacenterImpacts: the impacts calculated before in the Datacenter section, see the FU0 methodology.
DatacenterLifetime: the lifetime set as an input.
CommercializedPower: the total power that the provider car sell to its clients, in kW. Formula is:
CommercializedPower = TotalPowerInstalled / PowerUsageEffectiveness