Parameters
Building total surface
The total floor area inside the building, including all floors, in square meters / m³.
Location
Total power installed (IT+facility)
Load factor
Power Usage Effectiveness
Water Usage Effectiveness
The WUEsite (see EN 50600-4-9), Water Usage Effectiveness of the datacenter, only regarding the local water consumption.
Building lifespan
Lifespan time hypothesis for the whole datacenter building, in years.